Dniester Pumped Storage Power Plant
Multi-stage construction of the Dniester PSPP — one of the largest pumped storage plants in Europe.
- Type
- PSPP
- Status
- reference
- Years
- 2011–2023
- Location
- Ukraina / Ukraine
- Role
- General contractor
Project gallery
Execution of the master contract for the Dniester PSPP across consecutive stages: Stage I (2011–2023) — three hydro units; Stage II (2017–2023) — the fourth hydro unit; Stage III (from 2022) — hydro units No. 5, 6 and 7. Works covered the PSPP building, upper reservoir, tunnel water conduits, lower hydro installation and auxiliary facilities. Additionally (2012–2013) delivery of a control and safety system and commissioning of the KRUE-330 kV cells of the Dniester PSPP–Bar line.
Scope of works
- PSPP building
- upper reservoir
- tunnel water conduits
- power & transport facilities
- external networks
- control & safety system