← All projects
Group reference experience
Dnipro-1 Hydroelectric Power Plant
Repair of concrete water-conduit surfaces and the spillway dam crossing.
- Type
- INFRASTRUCTURE
- Status
- reference
- Years
- 2017–2019
- Location
- Ukraina / Ukraine
- Role
- Repair works
Project gallery
In 2017, repair of the concrete surfaces of the water conduits of hydro units No. 13, 15 and 18. In 2019, repair of the road crossing over the spillway dam with restoration of the asphalt-concrete surface and partial repair of expansion joints.
Scope of works
- concrete surface repair
- crossing repair with asphalt surface

