Kaniv Hydroelectric Power Plant

Reconstruction of the electrical part and hydro units, installation and commissioning of equipment.

Type
MODERNIZATION
Status
reference
Years
2012–2021
Location
Ukraina / Ukraine
Role
Reconstruction & installation

Project gallery

Comprehensive modernization delivered in several stages: reconstruction of the electrical part of unit No. 6 (2012–2013); reconstruction of hydro units No. 2 and 3 — 8 generating sets (2014–2016) with replacement of electrical and hydraulic equipment and a new control system; installation and commissioning of two further units — 7 turbines and 7 generators together with Ukrainian Energy Machines (2017–2021); building repair works, deformation-seam repairs and replacement of the T4 power transformer.

Scope of works

  • reconstruction of hydro units No. 2, 3 and 6
  • new control system
  • installation of 7 turbines and 7 generators
  • T4 transformer replacement
  • building repair works